In the beginning
willysfan61
Jeeper
- Posts
- 8
- Thanks
- 0
- Location
- Fuquay Varina NC
- Vehicle(s)
- 79 Alfa Spider, 93 Chevy 1500, 97 Sebring,46 CJ2A
I am hoping this will be a good place for general ranting as I work through the process of this CJ2a rebuild. When I purchased her off ebay (yes ebay) 2 years ago, the plan was to have a good project for my sons and I to work on. Well the boys do not seem very interested so I plan to soldier on myself.
At this stage I have the frame stripped of all parts, cleaned and primed. I am now working on the front and rear axles so I can re-attach them to the frame and cet a rolling chassis as soon as possible.
For the age of the car I was impressed by how few fasteners needed to be cut off. Most I was able to unthread. The frame although covered in surface rust had no majot rust issues at all.
At this stage I have the frame stripped of all parts, cleaned and primed. I am now working on the front and rear axles so I can re-attach them to the frame and cet a rolling chassis as soon as possible.
For the age of the car I was impressed by how few fasteners needed to be cut off. Most I was able to unthread. The frame although covered in surface rust had no majot rust issues at all.