Bellcrank to hydro conversion
[/SIZE] [SIZE=-1]b)
[/SIZE] [SIZE=-1]c)
[/SIZE] [SIZE=-1]d)
[/SIZE] [SIZE=-1]a) Master cylinder from 4-Wheelers[/SIZE] [SIZE=-1]b) Slave cylinder kit from Advance Adapters (kit includes the slave plus misc. parts)[/SIZE] [SIZE=-1]c) From left to right, the new m/c's pushrod, the core's pushrod and Napa's adjustable pushrod[/SIZE] [SIZE=-1]d) Stainless steel braided hydraulic line and 1 fitting from Advance Adapters (need 2 fittings)[/SIZE] [SIZE=-1]Items you will need:[/SIZE]
[/SIZE] [SIZE=-1]f)
[/SIZE] [SIZE=-1]g)
[/SIZE] [SIZE=-1]h)
[/SIZE] [SIZE=-1]e) firewall prior to the conversion[/SIZE] [SIZE=-1]f) original mechanical linkage[/SIZE] [SIZE=-1]g) close-up of the original mechanical linkage[/SIZE] [SIZE=-1]h) pedal assembly prior to the conversion[/SIZE] [SIZE=-1]
[/SIZE] [SIZE=-1]j)
[/SIZE] [SIZE=-1]k)
[/SIZE] [SIZE=-1]l)
[/SIZE] [SIZE=-1]i) firewall after cutting out enough to relocate the original wiring[/SIZE] [SIZE=-1]j) firewall after mounting the new master cylinder[/SIZE] [SIZE=-1]k) Napa pushrod with an extra flat washer at the bottom and hardware at the top for the pedal[/SIZE] [SIZE=-1]l) hose p/n J53004162 did NOT fit my application[/SIZE]
[/SIZE] [SIZE=-1]n)
[/SIZE] [SIZE=-1]o)
[/SIZE] [SIZE=-1]p)
[/SIZE] [SIZE=-1]m) firewall after the conversion[/SIZE] [SIZE=-1]n) master cylinder after the conversion[/SIZE] [SIZE=-1]o) slave cylinder after the conversion[/SIZE] [SIZE=-1]p) another view of the slave cylinder after the conversion[/SIZE] [SIZE=-1]q)
[/SIZE] [SIZE=-1]r)
[/SIZE] [SIZE=-1]s)
[/SIZE] [SIZE=-1]t)
[/SIZE] [SIZE=-1]q) pedal assembly after conversion[/SIZE] [SIZE=-1]r) another view of the pedal assembly after conversion[/SIZE] [SIZE=-1]s) view of the step before installing the headers and mufflers[/SIZE] [SIZE=-1]t) view of the header/muffler after being installed[/SIZE]We use essential cookies to make this site work, and optional cookies to enhance your experience.
-->> CLICK HERE <<-- to see further information and configure your preferences.